Cost reduction method - メーカー・企業と製品の一覧

Cost reduction methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Total Cost Reduction Method "Sun K Clear Method"

Labor-saving, effort-saving, shortened construction period, and easy installation! Ideal for improving the work environment on-site.

The total cost reduction method "Sun K Clear Method" allows for the installation of precast products by adjusting the height with a jack and then floating the main body above the foundation using pre-installed "Raku Pita (height-fixing bolts)." Concrete is then filled into the gap, integrating the retaining wall with the base. This method enables the construction of a robust retaining wall while improving the working environment on-site, reducing installation time, and achieving labor and effort savings, resulting in a total cost reduction. 【Features】 ○ Easy installation ○ Safe construction ○ Complete integration ○ Reduced installation time, labor, and effort ○ Improved installation accuracy For more details, please contact us or download the catalog.

  • Airport facilities
  • River construction
  • Retaining wall

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録